Early Partner Access

Work with us while the design is still being shaped

The partners we work with earliest have the most influence over how the plant design, commercial structure, and integration architecture develop. We are in preliminary discussions with a small number of operators. Conversations are open now.

3 Engagement tiers
No-fee First two tiers
NDA-gated Technical data sharing
Engagement Structure

Three tiers, progressing in commitment and depth

We structured our partner program to let you understand the technology and commercial model before making any commitment. The first two tiers require nothing but time. The third involves a binding commercial term sheet.

Tier 1

Technical Alignment

An NDA-gated technical briefing where we share full engineering design documentation and our current simulation results. No commercial commitment required. Designed for operators evaluating whether our technology is appropriate for their campus before entering site-specific conversations.

  • NDA execution and mutual data sharing
  • Full engineering design documentation package
  • Simulation environment walkthrough with Sofia
  • AI control architecture overview with Jamal
  • Regulatory status and licensing roadmap briefing
  • No fee, no exclusivity
Tier 2

Site Development

Joint site evaluation for a specific campus. We assess your power requirements, review proposed siting adjacency, model the electrical interconnect design, and produce a site-specific feasibility report. This tier is collaborative and involves your engineering and operations leads alongside ours.

  • Includes all Tier 1 deliverables
  • Site-specific feasibility assessment
  • Electrical interconnect design review
  • Power requirement modeling against your load profile
  • Preliminary civil and mechanical siting plan
  • No fee, shared exclusivity within your region
Tier 3

Commercial Structure

A binding term sheet covering the commercial structure for your site: PPA pricing, capacity terms, construction schedule commitments, and O&M responsibilities. This is the stage where we align on numbers and enter a formal development agreement. Executed after Tier 2 deliverables are accepted.

  • Binding development agreement
  • Fixed $/MWh PPA pricing structure
  • Construction schedule and milestone commitments
  • O&M responsibility matrix
  • Regional exclusivity period
  • Development fee at execution
Who We Work With

The partners we want to hear from now

Our conversations are most productive with organizations that are making real decisions about power for data center capacity in the 2027 to 2032 timeframe. That means you are currently evaluating grid interconnect applications, long-term PPAs from renewable developers, or other dedicated generation options, and you want to understand whether compact fission belongs in that comparison set.

We also accept conversations from infrastructure investors and family offices evaluating the generation asset side of AI infrastructure. If you are thinking about the gap between AI compute demand and firm power supply as an investment thesis, we want to understand your framework and share ours.

Data Center Operators

Developers or operators planning new campus builds of 20 MW or more who want dedicated firm generation with no grid dependency.

Infrastructure Developers

Real estate and infrastructure groups developing land for AI campus use who want to include dedicated power in the campus product offering.

Infrastructure Investors

Equity investors or debt providers looking at the generation asset layer of AI infrastructure, particularly in compact nuclear specifically.

Development Roadmap

Where we are and where we are going

Our development stages, from current pre-application engagement to first commercial unit. Timelines are design targets, not commitments.

2023 to 2025

Engineering design and simulation environment

Core reactor design developed and modeled. AI control system simulation environment operational. NRC pre-application engagement initiated. First partner technical briefings.

2026

Pre-application engagement and partner development

NRC pre-application meeting series. First site-specific feasibility assessments with Tier 2 partners. Regulatory review strategy finalized. Fuel supply chain discussions initiated.

2027 to 2028

License application submission

Combined license application submission to NRC. First Tier 3 commercial agreements executed with development partners. Site-specific environmental review initiated.

2030 to 2032

First commercial unit construction and commissioning

License approved. First unit construction begins at initial partner site. Target: first power delivery within 24 to 30 months of breaking ground. Commercial operation on partner schedule.

Ready to start a technical conversation?

Tell us about your power requirements and campus context. We will schedule a brief alignment call and, if it makes sense to proceed, start the NDA and Tier 1 briefing process. We typically respond within two business days.

Start a Conversation Review the Technology First